Commercial epoxy floor coating questions in Kansas City

Straight answers on commercial epoxy floor coatings in Kansas City: slab moisture, prep, systems, recoating, scheduling and how quotes work.

These are the questions Kansas City building owners and facility managers ask most about commercial epoxy floor coatings, each answered first in a sentence and then with the source or the limit behind it. Where a page on this website covers the topic in depth, the answer links to it.

Before the floor is coated

Do you coat residential garage floors?

No. We take on commercial and industrial floors only: plants, shops, kitchens, service bays, stock rooms, laboratories and similar working floors. See commercial and industrial floor coating.

Does every concrete floor need a moisture test?

It should get one. The ASTM relative humidity method notes that floor system makers generally require moisture testing on concrete before installation, and a federal resinous flooring specification has the installer check the slab against the manufacturer's written limit first. Our guide to concrete moisture testing before epoxy explains the tests.

Can a brand new slab be coated right away?

No. One federal flooring specification waits for at least 28 days of cure before its topping, and the ready mixed concrete association says a new slab can take weeks to months to dry enough, even in good conditions. A moisture test, not the calendar, says when it is ready.

What happens if the slab is too wet?

It needs more drying time or a moisture mitigation system the coating manufacturer approves, put down before the coating. The concrete industry's guidance also lists a breathable coating or a different floor as options.

How is the concrete prepared?

It is cleaned, degreased, and roughened mechanically or chemically to the profile the coating manufacturer requires, then cracks and joints are repaired. ASTM has published practices for both abrasion and acid etching of concrete before coating. Our page on concrete floor preparation for epoxy walks through each step.

Choosing a system

Is epoxy always the right coating?

No. A federal guide spec says not to use an epoxy matrix where the floor sees strong oxidizing acids, prolonged heat above 130 degrees F, steam or boiling liquids, or where the slab cannot be thoroughly dried. Our guide comparing epoxy, urethane and polyaspartic floor coatings covers the alternatives.

What is the difference between a coating and a troweled floor?

Thickness and build. A thin film coating is rolled on in coats measured in mils, while a troweled topping is resin mixed with aggregate and spread at a fraction of an inch. The federal specifications describe a thin film system at a nominal 15 mils and troweled toppings from 1/8 to 1/4 inch by traffic class.

Can the floor have marked aisles and walkways?

Yes. Stripes can be laid in a contrasting topcoat color with grit as part of the system. OSHA requires permanent aisles and passageways to be appropriately marked where mechanical handling equipment is used. The rule does not set the method or the color.

Will the floor be slippery?

Not if the texture is chosen for the room. A federal flooring specification warns that glossy finishes can be a slip hazard when wet or oily and has grit specified to suit each area.

Old and failing floors

Can an existing epoxy floor be recoated?

Yes, if it is still bonded. A pull-off test can show the bond, and the new coat must be compatible with the old one by the manufacturer's word. See epoxy floor repair and recoating.

Why did our last coating peel?

Most often for one of three reasons a federal flooring specification names: weak surface concrete, oil or other contamination, or moisture vapor coming up through the slab. Our guide on why epoxy floors peel or bubble helps match the symptom to the cause.

Are bubbles in a new floor a defect?

Usually they are outgassing, air leaving the concrete as the coat cures. A coatings manufacturer says these bubbles typically do not affect bond strength, so they are mostly cosmetic and can be sanded and patched.

Quotes, schedule and service area

How do I get a quote?

Send photos and a few facts about the floor through the quote form: the approximate area, what the floor is used for, what is on it now and when work can happen. We answer with a written quote or with questions.

Can the work happen at night or on a holiday?

Yes. After-hours and holiday work is available to fit the business's hours, and large floors can be done in sections.

How long will the area be closed?

It depends on the system and the product's data sheet, along with the preparation the slab needs and the temperature on the day. Our guide to preparing a building for floor coating explains how to plan the return to use.

What does a commercial epoxy floor cost?

Each floor is priced on its own photos and facts, because area, slab condition, moisture, the system and the working hours move the price. See what an epoxy floor coating costs.

Where do you work?

The Kansas City metro: Kansas City, Kansas, Kansas City, Missouri and the surrounding cities. See our service area.

Who does the installation?

Our installation partner, a Kansas City crew. We handle the questions and the written scope. Read more about us.

Sources

Still have a question about your floor?

Send it with a few photos through the quote form, and we will answer in writing. Get a Quote