These commercial epoxy floor coating guides for Kansas City buildings answer the four questions that decide whether a coated floor lasts: which resin system fits, why coatings fail, how slab moisture is tested and how to get the building ready. Each one is written for owners and facility managers, with its sources listed at the foot of the page.
Epoxy, urethane and polyaspartic systems compared
Most coated floors are a stack of layers, and the resin in each layer is chosen for a job: bond, build, or a wearing surface. Read epoxy vs urethane vs polyaspartic floor coatings to see what manufacturers say each chemistry is good at and where a federal guide specification says epoxy should not be used.
Why epoxy floors peel or bubble
Peeling is a bond failure at the concrete, and bubbles in a new coat are usually air leaving the slab. Read why epoxy floor coatings peel or bubble to match what you see on your floor to its likely cause.
Moisture testing before a floor is coated
All concrete gives off some moisture vapor, and epoxy coatings are on the concrete industry's list of moisture-sensitive floors. Read concrete moisture testing before epoxy for the calcium chloride and relative humidity tests, their limits and what happens when a slab fails.
Getting a building ready for floor coating
A coating job goes best when the floor is cleared, the heat is steady and the phasing is agreed in writing. Read how to prepare a commercial building for floor coating for a step-by-step plan and a one-page checklist.
Floor coating costs
For the five things that move a commercial floor quote, see what an epoxy floor coating costs.
Get a written quote
Send photos of your floor and a few facts about the slab, and we will answer in writing. Get a Quote
